WASH Projects
Proposed Wastewater management

Special design needed — high groundwater near bridge — Nanaksar, Punjab

Identified and surveyed by field engineers, waiting for a funder.

Near bridge, Nanaksar, Faridkot, Faridkot, Punjab

Cost still being assessed

Field engineers are finalising the estimate for this site. Express interest and we will send you the costed proposal as soon as it is ready.

Technical details

About this project

What gets built

Groundwater sits close to the surface here, so a sealed or raised system has to be designed to avoid contaminating it.

Why it is needed

Wastewater collects on open ground where it stagnates, breeds mosquitoes and seeps towards groundwater.

What your funding changes

Infrastructure the village already has is brought back into working order, which costs far less than building new.

Handles about 3,20,000 litres of used water a day

Where it is

District
Faridkot
Block
Faridkot
Village
Nanaksar
Landmark
Near bridge
Map
Open in Google Maps →
Village profile
Nanaksar →

How funding this works

Expressing interest is not a payment. It starts a conversation, and you see a full proposal before committing anything.

  1. 1

    You express interest

    Tell us the amount and timeline you have in mind. Nothing is committed at this stage.

  2. 2

    We send a proposal

    Within 72 hours you get a costed proposal with the implementing partner named.

  3. 3

    You approve

    Review the scope and sign off. Funds are released against agreed milestones.

  4. 4

    Work begins

    The partner builds, and you get progress reporting from the ground until handover.

Technical details (WASH Institute survey data)

Every field exactly as recorded by the survey team, for diligence and reporting.

Reference ID
581248786SLWM3345
Type of intervention required
Liquid Waste Management
SLWM intervention
Drain End Point The point where a village drain empties out, usually into a pond, a field or open land.
Nature of issue
Open land
SLWM solution required
Water table very high Groundwater sits close to the surface here, so a sealed or raised system has to be designed to avoid contaminating it.
Existing or proposed
Proposed Identified and surveyed by field engineers, waiting for a funder.
Capacity of SLWM intervention
320 KLD Handles about 3,20,000 litres of used water a day
Cost
₹ 0
Coordinates
30.70228, 74.7443884