WASH Projects
Existing Wastewater management

Survey and repair of the existing system near the Main road Jalalabad — Kamre Wala, Punjab

Already built on the ground — needs repair, upgrading or ongoing support.

Main road Jalalabad, Kamre Wala, Jalalabad, Fazilka, Punjab

Cost still being assessed

Field engineers are finalising the estimate for this site. Express interest and we will send you the costed proposal as soon as it is ready.

Technical details

About this project

What gets built

An engineer assesses what is already built here, then repairs or expands it to match current demand.

Why it is needed

Field engineers surveying this village recorded an untreated waste problem at a drain outlet that needs fixing.

What your funding changes

Infrastructure the village already has is brought back into working order, which costs far less than building new.

Handles about 3,31,372 litres of used water a day

Where it is

District
Fazilka
Block
Jalalabad
Village
Kamre Wala
Landmark
Main road Jalalabad
Map
Open in Google Maps →
Village profile
Kamre Wala →

How funding this works

Expressing interest is not a payment. It starts a conversation, and you see a full proposal before committing anything.

  1. 1

    You express interest

    Tell us the amount and timeline you have in mind. Nothing is committed at this stage.

  2. 2

    We send a proposal

    Within 72 hours you get a costed proposal with the implementing partner named.

  3. 3

    You approve

    Review the scope and sign off. Funds are released against agreed milestones.

  4. 4

    Work begins

    The partner builds, and you get progress reporting from the ground until handover.

Technical details (WASH Institute survey data)

Every field exactly as recorded by the survey team, for diligence and reporting.

Reference ID
583269628SLWM3899
Type of intervention required
Liquid Waste Management
SLWM intervention
Drain End Point The point where a village drain empties out, usually into a pond, a field or open land.
Nature of issue
Existing Water treatment structure (e.g., WSP, DEWATS, etc.) An existing wastewater treatment structure
SLWM solution required
Check existing system for repairs or add capacity if required An engineer assesses what is already built here, then repairs or expands it to match current demand.
Existing or proposed
Existing Already built on the ground — needs repair, upgrading or ongoing support.
Capacity of SLWM intervention
331.372400756144 KLD Handles about 3,31,372 litres of used water a day
Cost
₹ 0
Coordinates
30.6164435, 74.2629532