WASH Projects
Existing Wastewater management

Wastewater management near the Almwala road — Rajiana, Punjab

Already built on the ground — needs repair, upgrading or ongoing support.

Almwala road, Rajiana, Baghapurana, Moga, Punjab

Cost still being assessed

Field engineers are finalising the estimate for this site. Express interest and we will send you the costed proposal as soon as it is ready.

Technical details

About this project

What gets built

Field engineers have logged the problem here and are still scoping the right fix.

Why it is needed

Spillage and overflow from the overhead tank collects at its base, creating a permanently wet, contaminated patch.

What your funding changes

Field engineers complete the design and the village gets a solution matched to the problem on the ground.

Handles about 200 litres of used water a day

Where it is

No GPS coordinates were recorded for this site during the survey.

District
Moga
Block
Baghapurana
Village
Rajiana
Landmark
Almwala road
Village profile
Rajiana →

How funding this works

Expressing interest is not a payment. It starts a conversation, and you see a full proposal before committing anything.

  1. 1

    You express interest

    Tell us the amount and timeline you have in mind. Nothing is committed at this stage.

  2. 2

    We send a proposal

    Within 72 hours you get a costed proposal with the implementing partner named.

  3. 3

    You approve

    Review the scope and sign off. Funds are released against agreed milestones.

  4. 4

    Work begins

    The partner builds, and you get progress reporting from the ground until handover.

Technical details (WASH Institute survey data)

Every field exactly as recorded by the survey team, for diligence and reporting.

Reference ID
588492454SLWM5370
Type of intervention required
Liquid Waste Management
SLWM intervention
Public Water Point A shared tap, hand pump or overhead tank where spilt water collects and turns stagnant.
Nature of issue
Overhead Tank (OHT) Overhead water tank
SLWM solution required
NA Field engineers have logged the problem here and are still scoping the right fix.
Existing or proposed
Existing Already built on the ground — needs repair, upgrading or ongoing support.
Capacity of SLWM intervention
0.2 KLD Handles about 200 litres of used water a day
Cost
₹ 0