WASH Projects
Existing Wastewater management

Decentralised wastewater treatment plant near Chirdi saab gurughar — Adam Pura, Punjab

Already built on the ground — needs repair, upgrading or ongoing support.

Near Chirdi saab gurughar, Adam Pura, Bhagta, Bhatinda, Punjab

₹92.80 L
Estimated project cost
Technical details

About this project

What gets built

A compact, low-maintenance plant that treats the village’s wastewater using natural processes rather than electricity-hungry machinery.

Why it is needed

Field engineers surveying this village recorded an untreated waste problem at a drain outlet that needs fixing.

What your funding changes

Wastewater is cleaned before it leaves the village, protecting the pond, the fields and the groundwater people drink from.

Handles about 3,27,789 litres of used water a day

Where it is

District
Bhatinda
Block
Bhagta
Village
Adam Pura
Landmark
Near Chirdi saab gurughar
Map
Open in Google Maps →
Village profile
Adam Pura →

How funding this works

Expressing interest is not a payment. It starts a conversation, and you see a full proposal before committing anything.

  1. 1

    You express interest

    Tell us the amount and timeline you have in mind. Nothing is committed at this stage.

  2. 2

    We send a proposal

    Within 72 hours you get a costed proposal with the implementing partner named.

  3. 3

    You approve

    Review the scope and sign off. Funds are released against agreed milestones.

  4. 4

    Work begins

    The partner builds, and you get progress reporting from the ground until handover.

Technical details (WASH Institute survey data)

Every field exactly as recorded by the survey team, for diligence and reporting.

Reference ID
568211453SLWM196
Type of intervention required
Liquid Waste Management
SLWM intervention
Drain End Point The point where a village drain empties out, usually into a pond, a field or open land.
Nature of issue
Strom water drain Storm water drain
SLWM solution required
DEWATS A compact, low-maintenance plant that treats the village’s wastewater using natural processes rather than electricity-hungry machinery.
Existing or proposed
Existing Already built on the ground — needs repair, upgrading or ongoing support.
Capacity of SLWM intervention
327.789421487603 KLD Handles about 3,27,789 litres of used water a day
Cost
₹ 92,79,596
Coordinates
30.513468, 75.2590622