WASH Projects
Proposed Wastewater management

Decentralised wastewater treatment plant near water tanki — Akliana (224), Punjab

Identified and surveyed by field engineers, waiting for a funder.

Near water tanki, Akliana (224), Balachaur, Nawanshahr, Punjab

₹72.99 L
Estimated project cost
Technical details

About this project

What gets built

A compact, low-maintenance plant that treats the village’s wastewater using natural processes rather than electricity-hungry machinery.

Why it is needed

Untreated wastewater drains straight into the village pond, fouling a water body that people and livestock still depend on.

What your funding changes

Wastewater is cleaned before it leaves the village, protecting the pond, the fields and the groundwater people drink from.

Handles about 2,04,500 litres of used water a day

Where it is

District
Nawanshahr
Block
Balachaur
Village
Akliana (224)
Landmark
Near water tanki
Map
Open in Google Maps →
Village profile
Akliana (224) →

How funding this works

Expressing interest is not a payment. It starts a conversation, and you see a full proposal before committing anything.

  1. 1

    You express interest

    Tell us the amount and timeline you have in mind. Nothing is committed at this stage.

  2. 2

    We send a proposal

    Within 72 hours you get a costed proposal with the implementing partner named.

  3. 3

    You approve

    Review the scope and sign off. Funds are released against agreed milestones.

  4. 4

    Work begins

    The partner builds, and you get progress reporting from the ground until handover.

Technical details (WASH Institute survey data)

Every field exactly as recorded by the survey team, for diligence and reporting.

Reference ID
593314738SLWM7269
Type of intervention required
Liquid Waste Management
SLWM intervention
Drain End Point The point where a village drain empties out, usually into a pond, a field or open land.
Nature of issue
Pond/ tank/ lake
SLWM solution required
DEWATS A compact, low-maintenance plant that treats the village’s wastewater using natural processes rather than electricity-hungry machinery.
Existing or proposed
Proposed Identified and surveyed by field engineers, waiting for a funder.
Capacity of SLWM intervention
204.5 KLD Handles about 2,04,500 litres of used water a day
Cost
₹ 72,99,210
Coordinates
31.1201466, 76.3316767