WASH Projects
Existing Wastewater management

Decentralised wastewater treatment plant near creamation ground — Buraj Tharod, Punjab

Already built on the ground — needs repair, upgrading or ongoing support.

Near creamation ground, Buraj Tharod, Bhagta, Bhatinda, Punjab

₹72.99 L
Estimated project cost
Technical details

About this project

What gets built

A compact, low-maintenance plant that treats the village’s wastewater using natural processes rather than electricity-hungry machinery.

Why it is needed

Field engineers surveying this village recorded an untreated waste problem at a drain outlet that needs fixing.

What your funding changes

Wastewater is cleaned before it leaves the village, protecting the pond, the fields and the groundwater people drink from.

Handles about 2,36,176 litres of used water a day

Where it is

District
Bhatinda
Block
Bhagta
Village
Buraj Tharod
Landmark
Near creamation ground
Map
Open in Google Maps →
Village profile
Buraj Tharod →

How funding this works

Expressing interest is not a payment. It starts a conversation, and you see a full proposal before committing anything.

  1. 1

    You express interest

    Tell us the amount and timeline you have in mind. Nothing is committed at this stage.

  2. 2

    We send a proposal

    Within 72 hours you get a costed proposal with the implementing partner named.

  3. 3

    You approve

    Review the scope and sign off. Funds are released against agreed milestones.

  4. 4

    Work begins

    The partner builds, and you get progress reporting from the ground until handover.

Technical details (WASH Institute survey data)

Every field exactly as recorded by the survey team, for diligence and reporting.

Reference ID
567690408SLWM8
Type of intervention required
Liquid Waste Management
SLWM intervention
Drain End Point The point where a village drain empties out, usually into a pond, a field or open land.
Nature of issue
Strom water drain Storm water drain
SLWM solution required
DEWATS A compact, low-maintenance plant that treats the village’s wastewater using natural processes rather than electricity-hungry machinery.
Existing or proposed
Existing Already built on the ground — needs repair, upgrading or ongoing support.
Capacity of SLWM intervention
236.176006493506 KLD Handles about 2,36,176 litres of used water a day
Cost
₹ 72,99,210
Coordinates
30.4687794, 75.0477006