WASH Projects
Proposed Wastewater management

Decentralised wastewater treatment plant near gurudwara — Sher Garh, Punjab

Identified and surveyed by field engineers, waiting for a funder.

Near gurudwara, Sher Garh, Amloh, Fatehgarh Sahib, Punjab

₹28.87 L
Estimated project cost
Technical details

About this project

What gets built

A compact, low-maintenance plant that treats the village’s wastewater using natural processes rather than electricity-hungry machinery.

Why it is needed

An open channel carries untreated wastewater through the village with nothing to clean it along the way.

What your funding changes

Wastewater is cleaned before it leaves the village, protecting the pond, the fields and the groundwater people drink from.

Handles about 66,186 litres of used water a day

Where it is

No GPS coordinates were recorded for this site during the survey.

District
Fatehgarh Sahib
Block
Amloh
Village
Sher Garh
Landmark
Near gurudwara
Village profile
Sher Garh →

How funding this works

Expressing interest is not a payment. It starts a conversation, and you see a full proposal before committing anything.

  1. 1

    You express interest

    Tell us the amount and timeline you have in mind. Nothing is committed at this stage.

  2. 2

    We send a proposal

    Within 72 hours you get a costed proposal with the implementing partner named.

  3. 3

    You approve

    Review the scope and sign off. Funds are released against agreed milestones.

  4. 4

    Work begins

    The partner builds, and you get progress reporting from the ground until handover.

Technical details (WASH Institute survey data)

Every field exactly as recorded by the survey team, for diligence and reporting.

Reference ID
579358066SLWM2707
Type of intervention required
Liquid Waste Management
SLWM intervention
Drain End Point The point where a village drain empties out, usually into a pond, a field or open land.
Nature of issue
Nallah Nallah (an open drainage channel)
SLWM solution required
DEWATS A compact, low-maintenance plant that treats the village’s wastewater using natural processes rather than electricity-hungry machinery.
Existing or proposed
Proposed Identified and surveyed by field engineers, waiting for a funder.
Capacity of SLWM intervention
66.1858267716535 KLD Handles about 66,186 litres of used water a day
Cost
₹ 28,86,650